Case Studies
Rollout blueprints—not invented customer logos
These are practical patterns for pilots, migration waves, multi-backend routing, and OCPI launches. They describe how operators structure decisions before production—not fabricated testimonials.
01 · Reference blueprint
CPO rollout: introduce GridOS without a big-bang backend replacement
How a brownfield operator can validate a pilot, add an OCPP routing layer, keep rollback optionality, and phase migration across charger groups.
Covers
- Pilot scope and success criteria
- Parallel backend routing strategy
- Rollback and operational ownership
- Commercial gates before expansion
02 · Mixed fleets
Modernize multi-brand OCPP estates without a fleet-wide reset
Normalize brands, firmware generations, and OCPP versions through one field layer so backend and partner decisions stop leaking into truck rolls.
Covers
- Multi-brand / multi-version OCPP
- Normalization before platform change
- Wave-based modernization
- Ops visibility during cutover waves
03 · Roaming launch
Launch OCPI roaming with tariff, session, and CDR quality intact
Separate charger connectivity from partner go-live so hubs and bilateral peers can expand coverage without silent commercial failures.
Covers
- Partner readiness checkpoints
- Tariff and token hygiene
- Session and CDR reconciliation
- Phased coverage expansion
Want this mapped to your estate?
Bring charger scale, backends in play, and roaming pressure. We will map a pilot shape—not a slide deck of invented logos.